Skip to content

Report · Discovery

Portfolio intake and prioritization

How ideas moved through Discovery from April to August 2026, and how the Q4 ranked list compares on value and effort. Demo data.

6 ideas Ready for Q4 planning

Demo data

6 of 12 ranked ideas fit Q4 capacity

Ideas logged Apr 1 to Aug 31, 2026; Q4 2026 ranking. As of September 4, 2026. Source: Pecos Mutual idea log and portfolio scoring sheet (fictional).

Summary

We logged 48 ideas from April to August. 29 passed Gate 1, and 11 have passed Gate 2: 5 went into Q3 and 6 are ready for Q4. At the final Q4 portfolio review, the cut line fell at 32 team-sprints, so the 6 highest-scoring ideas are ready for planning. The rest stay ranked for next quarter.

Charts

Ideas by Discovery stage, April to AugustIdeas logged: 48; Gate 1: Idea accepted: 29; Design reviewed: 22; Sized: 20; Gate 2: Ready for planning: 11. Gate 2 includes 5 projects planned for Q3 and 6 ready for Q4.01020304050Ideas loggedIdeas logged: 4848Gate 1: Idea acceptedGate 1: Idea accepted: 2929Design reviewedDesign reviewed: 2222SizedSized: 2020Gate 2: Ready for planningGate 2: Ready for planning: 1111
Ideas logged: 48; Gate 1: Idea accepted: 29; Design reviewed: 22; Sized: 20; Gate 2: Ready for planning: 11. Gate 2 includes 5 projects planned for Q3 and 6 ready for Q4. Demo data, Ideas logged Apr 1 to Aug 31, 2026; Q4 2026 ranking.
  • Above the cut line (Gate 2)
  • Below the cut line
Value against effort, Q4 ranked ideasValue score (business value + time criticality + risk reduction, 3–15) against T-shirt size for 12 ranked ideas. 6 fall above the cut line of 32 team-sprints; 6 fall below it.051015SMLValue scorePayroll audit self-service: S, value score 7Claims document OCR: M, value score 10Fraud signals dashboard: M, value score 10Agent quote status tracker: M, value score 9Premium payment plans: M, value score 9Spanish-language employer portal: M, value score 9Online first report of injury: L, value score 12Provider bill e-submission: L, value score 11Legacy policy admin retirement: L, value score 10Safety resource library: S, value score 4Medical bill review rules: L, value score 8Return-to-work planner: L, value score 8
Value score (business value + time criticality + risk reduction, 3–15) against T-shirt size for 12 ranked ideas. 6 fall above the cut line of 32 team-sprints; 6 fall below it. Demo data, Ideas logged Apr 1 to Aug 31, 2026; Q4 2026 ranking.

Findings

  • Most ideas stop at Gate 1, as intended. 19 of 48 ideas were redirected to Home Team backlogs as Discretionary work, or declined, before any design work.
  • Medium-sized ideas score best. Five of the six ideas above the cut line are size M. Their value is close to the larger ideas', for less than half the effort.
  • Online first report of injury just missed Q4. It has the highest time criticality, but at size L it would take the plan to 40 team-sprints. It ranks first for Q1 2027.
  • Two large ideas score low, the return-to-work planner and medical bill review rules. Both could be split into smaller projects with clearer early value.

Actions

  • Claims Experience Product Manager: prepare online first report of injury for Q1 2027, and check whether a smaller first release could fit Q4 as Discretionary work.
  • Product Managers for the low-scoring L ideas: propose splits before the October portfolio review.
  • Program Manager: take the 6 Gate 2 ideas into capacity planning.

Data

Q4 2026 portfolio ranking (cut line at 32 team-sprints) (demo data, as of 2026-09-04)
RankIdeaSizeValueTime crit.Risk red.ScoreTeam-sprints (mid)CumulativeDecision
1Payroll audit self-serviceS3223.502.52.5Gate 2: Ready for planning
2Claims document OCRM3343.3357.5Gate 2: Ready for planning
3Fraud signals dashboardM3253.33512.5Gate 2: Ready for planning
4Agent quote status trackerM4323.00517.5Gate 2: Ready for planning
5Premium payment plansM4413.00522.5Gate 2: Ready for planning
6Spanish-language employer portalM4323.00527.5Gate 2: Ready for planning
7Online first report of injuryL4532.4012.540Below cut line
8Provider bill e-submissionL5332.2012.552.5Below cut line
9Legacy policy admin retirementL2352.0012.565Below cut line
10Safety resource libraryS2112.002.567.5Below cut line
11Medical bill review rulesL3231.6012.580Below cut line
12Return-to-work plannerL4221.6012.592.5Below cut line

Source: Pecos Mutual idea log and portfolio scoring sheet (fictional). As of September 4, 2026. All figures are fictional demo data.